Tom pops in and updates - plumbers are draining down our old heating system today,ready to take it out, and heating engineers are trying to work out the best underfloor system for us to install - it all passes through numerous hands before being signed off. The new system will need to be fed directly from the mains water supply and that is going to mean a new pipe going down which is'nt in the costings - wait and see how much this will be.
They'll start to rip up the floorboards soon and a container will appear at the front to store them in ready for them going back down again.
Tom attempts to leave but is blocked in by a toddler and buggy - the toddlers may not have breached his security cordon (this time) but he can't breach theirs either.
2 More Brummies appear (see day 2) - There is a brief language barrier, but they start to speak more slowly and we understand that they can't find the water tanks.
Pass them to the expert (Mark) and the tanks are eventually located.
Wednesday, January 21, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment